Scenario Generation Group on the S1 // Projects Tab
Use the commands in this group to perform such tasks as cleanse, publish, accelerate, and export a schedule.
Field | Description |
---|---|
Cleanse Schedule | Click this icon to display the Cleanse Schedule dialog box to cleanse and resolve flaws in your schedule. |
Accelerate Schedule |
Click to accelerate the schedule to meet faster completion deadlines or to get a delayed project back on track. An Accelerate Schedule dialog box provides you with different accelerate options. After acceleration, you can right-click on any Activity view column, select
Show Column Chooser, and add the following Accelerated columns to report on and compare results:
You can also use the above fields on the Metrics tab for filters and formulas, and on the Metrics Define Columns tab and Detailed Report tab. You can use these fields to build metrics and run reports that look at the results of acceleration. If you create an accelerated scenario, an Acceleration tab is added to the Activity Details pane for the scenario project. |
Schedule Realism Advisor | The advisor provides suggestions for calibrating each activity based on a given criteria. Click to display the Schedule Realism Advisor dialog box to select options and run the advisor. |
Scenario Calibration | Use these options to define settings for scenario calibration:
|
Export Scenario | Click to export (publish) the selected scenario back to its original format (Open Plan, MS Project, or Primavera). The file is scheduled/CPM-time analyzed in Acumen before being published and therefore has updated early/late dates, float, and so on. |
- Related Topics:
- Cleanse Schedule Dialog Box
Use the Cleanse Schedule dialog box to specify how you want the schedule to be cleansed. - Schedule Realism Advisor Dialog Box
The Schedule Realism Advisor provides suggestions for calibrating each activity based on a given criteria. - Calibration Template Editor Dialog Box
Use the settings in this dialog box to change the calibration levels.
Parent Topic: Ribbon Commands on the S1 // Projects Tab
Related concepts
Related tasks
Related reference